|
Wings are completed at the ARF stage, the only work required to
complete them is the installation of the servos.
Wings are built out of four ribs (CNC cutouts with servo openings)
and two spars along them (Glass/Carbon/Kevlar) .
Ailerons are hinged on
a long stainless steel tube.
|